
9-day diagnostic
Decision Twin built from existing process documentation. No extended discovery. No workshop dependency.
COOs & Heads of Operations
A cost initiative looks right on a spreadsheet. Six months later, controls have degraded and cycle time has lengthened.
Because nobody modelled what cost reduction does to the other five levers simultaneously. 3-Cubed computes the full trade-off before you commit the capital.

THE CHALLENGE
70% of transformation programmes don't deliver. Not because the execution was poor — because the trade-off wasn't visible before the capital was committed. Programmes optimise one lever and break three others.
How 3-Cubed Addresses It

Decision Twin built from existing process documentation. No extended discovery. No workshop dependency.

Cost, Client, and Control consequences of each option — modelled simultaneously across all six PROFIT levers.

15–20 configuration scenarios. Each with cost, cycle time, and control consequences before you commit.

Sponsors approve faster because trade-offs are visible per option. Implementation risk drops because second-order effects are already modelled.
COOs & Heads of Operations — Computed Outputs
Each Metric Computed Across The Full PROFIT Lever Interaction. Each Tile Shows Which Levers Drove The Outcome.
4.2%
Cost Base Reduction
· Unit Economics · Investor Lens
Driven By
13.2 DAYS
Cycle Time Reduction
· Experience & Trust · Client Lens
Driven By
80%
Control Coverage
· Risk & Compliance · Regulator Lens
Driven By
Case Evidence
Banking: KYC / Compliance
Reduce cycle time and cost
Oil & Gas: Accounts Payable
Reduce cost, maintain controls
Insurance: Claims
Reduce cost and cycle time
All cases anonymised by industry. Client names available under NDA.
9 Days
Diagnostic turnaround
15–18 hrs
SME time required
2 FTE
Break-even threshold
